I would dribble band the P&K + micros prior to the lime application. I find it most desirable to wait on .25 inch rain or 3 to 5 day delay minimally between the two applications.Lime and Fertilizer This Fall
I would dribble band the P&K + micros prior to the lime application. I find it most desirable to wait on .25 inch rain or 3 to 5 day delay minimally between the two applications.